製品説明
How to Install a TES Tank: Foundation Erection and Commissioning Installing a TES tank runs: survey and foundation (ring-wall or slab from geotech), shell erection (bolted panels or welded shell), diffuser/nozzle fit, insulation with vapour barrier, hydrotest, then charge-discharge commissioning that proves the thermocline. Bolted erection is faster on site than welded. Center Enamel has no published TES delivery; its large-bolted-vessel builds show erection capability, cited